Suncook River Geomorphology-based Restoration Alternatives
Suncook River Geomorphology-based Restoration Alternatives Study Documents

The Suncook River, which flows southwest towards the Merrimack River from its headwaters at Crystal Lake in Gilmanton, experienced a 100-year flood event during the flood event that occurred on May 15 and 16, 2006. The high flood waters caused the Suncook River to change course (an event known as an “avulsion”) in the Town of Epsom near the Huckins Mill Dams, upstream of Bear Island.

To better understand the avulsion and the appropriate response to this unusual event, the Town of Epsom has undertaken a study of the avulsion with funding from the NH Department of Environmental Services and the Friends of the Suncook River. The study seeks to conduct a detailed survey of the river, develop potential solutions to address the flooding and sedimentation issues related to the avulsion, and to evaluate each alternative using criteria such as cost, constructability, property impacts, etc. The study is a tool that will help the Town and the State select the proper course of action for the restoration and/or stabilization of the river.

A draft version of the report has been issued for public review.

Public Informational Meeting

Meeting Announcement:

Adobe PDF documentPublic Informational Meeting Announcement – March 26, 2008

Slides presented at the March 26 Public Informational Meeting:

Adobe PDF document3/26/08: Meeting Presentation - VHB (Adobe PDF, 5.3MB)

Adobe PDF document3/26/08: Meeting Presentation - FEMA (Adobe PDF, 4.8MB)

Adobe PDF document3/26/08: Meeting Presentation - USGS (Adobe PDF, 2.0MB)

Draft Report - Suncook River Avulsion, Geomorphology-based Alternatives Analysis

The links below contain the draft project report:

Adobe PDF documentExecutive Summary (Adobe PDF, 0.1MB)

Adobe PDF documentReport Text (Adobe PDF, 0.3MB)

Adobe PDF documentFigures (Adobe PDF, 5.3MB)

Adobe PDF documentAppendices (Adobe PDF, 7.5MB)

Public comments on the Draft Technical Report are welcome, and would be most useful if submitted by April 23, 2008.

Comments on the Draft Suncook River Technical Report are welcome, and can be sent to pwalker@vhb.com.

Alternatively, written comments can be submitted to the following address:

Peter J. Walker
Vanasse Hangen Brustlin, Inc.
Kilton Road, Six Bedford Farms
Bedford, New Hampshire 03110-6532