-
I-476 Hard Shoulder Running
VHB’s ITS solutions support PennDOT’s I-476 hard shoulder running project, including variable speed limits, lane management, and automated object detection.
-
NYU Langone Opens New Ambulatory Care Center in Patchogue
VHB supported the adaptive reuse of a former retail building into NYU Langone's new ambulatory care center in Patchogue, New York.
-
Welcome to the 2026 National Hydraulic Engineering Conference!
Welcome to the 2026 National Hydraulic Engineering Conference, with complimentary wi-fi brought to you by VHB!
-
Boston Children's Museum Waterfront Resiliency Project Breaks Ground
The Boston Children's Museum Waterfront Resiliency Project will protect the area from rising sea levels and offer immersive and playful learning opportunities.
-
VHB and Partners Earn 2026 Preservation Award for Adaptive Reuse Project
VHB helped preserve the 10th Cavalry’s legacy while creating much-needed affordable housing with this adaptive reuse project that won a 2026 Preservation Award.
-
Stream Restoration
VHB’s interdisciplinary “stream team” partners with communities to enhance ecological health, delivering a suite of water resources and environmental services.
-
Aberjona River Flood Mitigation Program
VHB supports a flood mitigation program that improves resiliency and reduces flood risk for more than 300 properties in Winchester, MA.
-
China Lake Outlet Dam Fishway Retrofit
VHB designed a fish passage retrofit at China Lake Outlet Dam to help restore alewife access to spawning habitat.
-
River & Coastal Restoration in Great Bay
VHB supports Great Bay communities with dam feasibility studies, stream restoration design and watershed resilience services.
-
Lemon Stream Dam Removal
VHB is supporting a dam removal and stream restoration project to restore fish passage for endangered Atlantic salmon in Maine.
-
Mill Pond Oyster River Dam Removal
VHB helped Durham remove an aging dam, restore natural river flow, improve water quality, and support fish passage.
-
Owens Pond Spillway and Restoration Improvements
Improving flood control and fish passage at Owens Pond through sustainable spillway design and wetland restoration.
-
Penobscot River Fish Passage Assessment
VHB is assessing fish passage barriers in Maine’s Penobscot watershed to restore aquatic connectivity and improve ecosystem health.
-
Rockefeller Dam Removal
VHB helped Farm & Wilderness Foundation remove the Rockefeller Dam, restore stream conditions, secure funding, and navigate permitting requirements.
-
Prestile Brook Culvert Replacement
VHB is supporting MaineDOT with preliminary design for the replacement of the Prestile Brook culvert in Caribou, ME.
-
Suncook River Restoration
VHB evaluated Suncook River restoration alternatives after 2006 flooding changed the river’s course in Epsom, NH.
-
An Interview with Dan Wintermeyer: Industrial Development in Atlanta
Dan Wintermeyer shares insights on the Atlanta industrial market
-
VHB Welcomes Will Hawthorne as Florida Director of Transportation Engineering
VHB welcomes Will Hawthorne to drive innovation and transform transportation engineering
-
VHB Earns Three Distinguished Engineering Awards in New Jersey
VHB earned three Distinguished Engineering Awards from the New Jersey Alliance for Action for projects advancing redevelopment, housing, and community growth.
-
Seth Lattrell Shares Insights on the Future of Energy and Sustainability
Seth Lattrell spoke at BisNow's Boston Energy and Sustainability Summit, highlighting how developers are integrating renewables and decarbonizing new builds.